Tuesday’s wonders of engineering: The Beijing National Stadium
Source: Pixabay

In 1889, the Eiffel tower was unveiled at the Paris World Fair and, despite the initial debate over its aesthetic appeal, within a short period became the iconic image of a city and a symbol of technological progress. Over one hundred years later, at the 2008 Olympic games in Beijing, China unveiled its own architectural wonder, which, like the Eiffel Tower, was a metal mega-project.​

The Beijing National Stadium – more often referred to as the Bird’s Nest Stadium – took five years to complete and was constructed using 42,000 tons of steel, making it the largest steel structure in the world.

Tuesday’s wonders of engineering: The Beijing National Stadium
Source: wallpaperswide.com

Design

Measuring 330 meters long, 220 meters wide and 69.2 meters tall, the design of the Bird’s Nest stadium design is based on 24 trussed columns, weighing 1000 tons each. Due to their weight, no crane was strong enough to lift the columns into place when construction of the stadium’s steel outer shell began in 2005. As a result, the columns were shipped in parts to Beijing and assembled in position. After all 24 columns were in place, smaller beams were welded between to give the structure greater strength and enhance the unique, elliptical crosshatch appearance.

Finally, the third set of beams was added in order to hang the transparent, polymer membrane, which provides roofing between the steel beams.

Tuesday’s wonders of engineering: The Beijing National Stadium
Source: wallpaperswide.com

During the design stage of the project, the Swiss architecture firm Herzog & de Meuron, along with their partners Arup and China Architecture Design & Research Group, had numerous issues to address beyond the aesthetic appeal of the stadium. One crucial problem was whether, once in place, the 42,000 tons of steel required to build the structure would be able to support its own weight, or whether it would crumble once the 78 support pillars used during construction were removed. The local government also required that the stadium design be able to withstand an 8.0 magnitude earthquake.

As if these issues were not complicated enough, the architects and engineers also had to keep in mind the effects of thermal expansion, that is the tendency for steel to expand and contract as the temperature changes. In Beijing, where the temperature can range from over 30°C in the summer to -20°C in the winter, this is no small consideration. To address these three engineering issues the design team worked with Chinese steel producers Baosteel and Wuhan Iron & Steel to develop new steel grades that would meet the strength and flexibility requirements of the project.

According to Lin Shuguang, General Manager of Baosteel, three months of research led to the production of a new steel with low phosphor and low sulfur content, which they termed Q35. Q35 is a high-hardness steel able to bear stress up to 35 x 106 pascals. This would be critical in the construction of the 24 trussed columns, each of which was 300 meters in length and expected to help bare a load of 11,200 tons. Wuhan Iron and Steel group designed the second grade of steel that would make up the remaining portion of the stadium’s shell, referred to as Q460.

Q460 provided a high strength, but flexible, steel to support the trusses and ensure that the stadium’s shell would not become a 42,000-ton steel heap.

Construction

The new, high strength steels, however, presented their own problems during construction, as higher than normal welding temperatures were required, often in very precarious and high locations. Welding, moreover, could only be conducted at temperatures of 15-16°C, which meant that workers had to weld during evening hours. In August of 2006, over 400 welders worked for three straight nights to weld the 320 kilometers of welding seams required to assemble the stadium’s iconic, latticed steel frame.

Tuesday’s wonders of engineering: The Beijing National Stadium
Source: wallpaperswide.com

By September of 2006, the structure was deemed ready to stand on its own and the 78 support pillars were removed one-by-one in front of a nervous design and construction team, leaving the entire structure standing on its own. Like the Eiffel Tower, the Bird’s Nest has not been without its share of criticism, particularly for its non-traditional style and appearance. Nevertheless, it has become a poignant symbol of modern China and the engineering ability of mankind.

Interesting facts about Beijing National Stadium

The construction adopts advanced energy conservation design and environmental protection measures, including favorable natural ventilation, natural lighting, the entire recycling of rainwater, the use of renewable geothermal energy resources and the use of solar photovoltaic power generation technology.

Beneath the football field, there are 312 Ground Source Heat Pump system wells which can supply heat (from the earth) to the stadium in winters and supply cold (from the earth) to the stadium in winters by burying heat exchange tube beneath, which saves much electric power.

The rainwater collected by the system of recycling rainwater on the top of the stadium can be used to afforest, flush toilets, control fire or flush the runway, which can save much water resources. Thus, the Bird’s Nest is known as a large Green Building without any doubt.

Located at the Olympic Green, the stadium cost about $428 million.

The building’s dynamic form and vast scale create a new icon for China and the city of Beijing.

The circular shape of the stadium represents ‘heaven’.

The structural form of the stadium is popularly described as a ‘bird’s nest’, with its pattern inspired by Chinese-style ‘crazed pottery’. Seemingly random, the pattern abides by complex rules for which advanced geometry was defined.

Tuesday’s wonders of engineering: The Beijing National Stadium
Source: wallpaperswide.com

The stadium is currently used mostly for football matches.

As Beijing is located in one of the world’s most active seismic zones, Arup used advanced seismic analysis to test the stadium under various earthquake conditions and ensure that the structure can withstand major shocks.

The stadium will be used for the opening and closing ceremonies of 2022 Winter Olympics. It will be the only stadium to host both the Summer and Winter Olympics and Paralympics opening ceremonies.

In spite of the lack of significant events, the stadium appears to be quite profitable, drawing some 20,000 to 30,000 people a day at the price of a 50 yuan (about $8) admission.

Official Worcon partners

  • TCM International - Tool Consulting and Management Group Worcon official partner
  • Feal perfection in aluminium Worcon partner
  • Iscar
  • Schunk - competence leader for gripping systems and clamping technology signed partnership contract with Worcon B2B manufacturing platform
  • Đuro Đaković Energy official Worcon partner
  • Promming d.o.o. Worcon official partner
  • Tim teh d.o.o. Worcon official partner
  • Kemperle Worcon official partner
  • CRYO-RT Worcon official partner
  • Nieros Worcon official partner
  • Tija Industry Worcon official partner
  • Pib Extra d.o.o. Worcon official partner
  • Kowe CNC Worcon official partner
  • Biam i zavarivanje
  • Celje International Industry Fair
  • Mediteran Inox d,o.o. VAŠ EKSPERT ZA METAL!
  • Kovinoplastika Worcon official partner
  • Ing Lukac Worcon official partner
  • Tehnovar Worcon official partner
  • Marex Elektrostroj official Worcon partner
  • Development and Educational Centre for the Metal Industry Cakovec Croatia is Worcon platform official partner
  • Alas info Worcon partner in CNC technology
  • Hstec
  • Strojotehnika